year
of execution |
:
|
2007
|
investment
|
: |
€
9.500,-- ex IVA
|
under
floor heating |
: |
150
m2
|
heat
source |
: |
8kw
Altherma of Daikin
|
hot
tap water |
: |
300
liter boiler connected to the
heat pump
|
|
|
|
Details
Newly built
villa with under floor heating only on the ground floor. It
is installed on an reinforcemant grid with insulation and a vapor
barrier foil underneath.
Almost all
materials are supplied by local firms, also the assistence with the
installation of the under floor heating.
This is the first project with an Altherma by ARCOS.SP |
|
|